U.S. selects 31 projects to expand existing grid capacity
DOE announced its intention to support projects across 26 states with $1.9 billion in federal funding. Reconductoring and grid-enhancing technologies are expected to unlock more than 23 GW of additional transfer capacity. These are projected benefits, not completed upgrades.
Engineering takeaway
Higher line capacity warrants a review of thermal limits, load encroachment, equipment ratings and the assumptions behind protection coordination.
Editorial analysis · not a claim about the installed design